Page 12 - Infinity Power Sustainability Report 2024
P. 12
12 INFINITY POWER 2024 SUSTAINABILITY REPORT | LEADING THE JUST ENERGY TRANSITION
Our safety performance All our contractors completed mandatory health and
safety induction training in 2024, ensuring they are Adapting safety training
We improved our safety record in 2024, with no lost time
well-informed and safety-conscious from day one. to emerging risks
incidents during over 1.2 million working hours across our
sites. Our lost time incident rate (LTIR) decreased to zero One of our team members at our West Bakr
Site managers also deliver shorter daily ‘toolbox’
and our total recordable incident rate (TRIR) stood at wind farm was bitten by a non-poisonous snake
training talks on relevant topics. In 2024, we delivered
0.16 per 200,000 hours worked, which is industry-leading during bird observation activities in September
1,415 hours of toolbox talks to our workforce, covering
in the utilities sector. We are pleased to demonstrate 2024. Prompt medical care confirmed no lasting
topics including heat stress management, snake
continuous improvement in creating a safer workplace, health effects or lost working time, but the incident
and wildlife awareness, safe driving practices during
and the progress we’ve made with building a strong highlighted an increasing risk at the site.
adverse weather conditions, proper personal protective
safety culture.
equipment usage, and emergency response. This
In response, we adapted our safety training to
is an increase of 63% compared to 2023 and was due
We closely monitor near-miss incidents to identify include enhanced wildlife awareness, updated
to increased maintenance activities across some
potential risks and prevent future accidents. In August personal protective equipment requirements, and
of our projects.
2024, during an extended maintenance programme, revised field protocols for bird monitoring activities.
a component was dropped inside one of our turbine By continuously refining our training based on
1,415 delivered to our employees
towers at Khobab wind farm. Noone was injured and hours of Toolbox Talks real-world incidents, we ensure our teams stay
there was limited property damage, however the and contractors. prepared for evolving risks across our project sites.
incident was classified as high-potential and was
investigated thoroughly. It highlights the importance of
maintaining strong health and safety practices during
Safety performance: lost time incidents Number of workers
long-term routine maintenance, which we reinforce
on our operational sites
through a strong safety culture, open reporting, and 0.5
0.43
regular site checks. 0.4 700
665
0.3
Our safety training programmes are crucial in protecting 0.21
0.2 0.16 600
our team from harm. Each of our sites run regular formal
0.1 533
safety training and meetings and in 2024, we delivered 0.0
0.0
over 1,158 hours of safety training to continually build our 500
2023 2024
2023 2024
team’s skills and awareness.
LTIR: Lost time incidents per 200,000 hours worked
RIR: Reportable incidents per 200,000 hours worked